Ironbark Workforce
Mining & infrastructure workforce accommodation

Rooms built like plant equipment.
Delivered like freight.

Ironbark Workforce supplies factory-completed ensuite accommodation units for Australian mine sites, camps and remote infrastructure projects — fitted out, wet-area sealed and MEP-tested before they leave the production line.

EOI is non-binding · Production Run 01 allocation · target first deliveries 2027

Capability Plate IBW-SPEC-00
Factory production cycle5–6 wksper module batch, fit-out & MEP complete
Assembly tolerance1–1.5 mminternal QA standard, steel MiC frame
Wind region optionsA – Dcyclonic Region C/D engineering variants
Partner factory track record25,200+ units22+ yrs modular manufacturing, 5 countries
Pre-production · Accepting EOI
Production Run 01 — now allocating
Limited first-run slots · EOI holders quoted first · no payment taken at EOI stage
Product range

Three units. One steel chassis.

Every Ironbark Workforce unit shares the same welded steel MiC module and factory fit-out line. Configuration, cladding and wind rating are specified per project.

Ensuite RoomIBW-EN1

The workhorse. Single ensuite accommodation room for operational villages and construction camps — bed, desk, robe, split-system, private bathroom.

  • 1 module · approx. 21 m² incl. ensuite
  • Full wet-area membrane, factory water-tested
  • Skid or screw-pile footing, craneable set
  • Wind Region A–D variants
Guide, delivered & installed*from A$69k ex GST
Twin Motel BlockIBW-TW2

Two back-to-back ensuite rooms in a single lift — halves crane time and services connections for larger villages and exploration camps.

  • 1 module · 2 keys, shared services riser
  • Acoustic party wall for shift-sleep rating
  • Verandah / walkway interface options
  • Common-area and laundry variants
Guide, delivered & installed*POA per project
Manager / DuplexIBW-MD2

Senior-staff and family-format quarters: living room, kitchenette and separate bedroom across one or two modules, to residential fit-out standard.

  • 1–2 modules · 1-bed or 2-bed layouts
  • Residential-grade kitchen & joinery
  • Suits long-stay operational rosters
  • Shared platform with Ironbark Homes
Guide, delivered & installed*POA per project

*Guide pricing is indicative for pre-launch planning, based on standard spec to accessible east-coast sites. Remote cartage, cyclonic engineering and camp infrastructure are quoted per project. All figures subject to formal quotation.

Why factory-built

The schedule risk stays in the factory

Modules arrive fitted-out, tested and tagged — site work is footings, set, and connection. That changes what your camp program looks like.

85%+
Completed off-site

Fit-out, wet areas, electrical and plumbing finished and inspected on the production line, not on your pad.

5–6 wks
Production cycle

Carcass, fit-out and E/M per module batch — order book to wharf in a mining-schedule-compatible window.

Days
On-site install

Craned sets onto pre-poured footings. Fewer trades, fewer swings, less live-camp disruption and site risk.

1 : 1
Unit traceability

Each module ships with a digital inspection record — its own "birth certificate" from weld to wharf.

Pre-order pathway

From EOI to keys-in-doors

Registering interest costs nothing and commits you to nothing. It places you in the quotation queue for Production Run 01 and locks in first access to delivery slots.

STEP 1 · NOW

Register interest

Tell us your site, unit types and rough quantities below.

5 minutes
STEP 2

Scope call

We confirm spec, wind region, site access and delivery window.

Week 1–2
STEP 3

Formal quote

Fixed pricing with engineering, freight and install build-up.

Week 3–4
STEP 4

Pre-order

Deposit secures your factory slot in Run 01.

On acceptance
STEP 5

Factory build

Production, QA inspections and shipping to an Australian port.

~5–6 wks + transit
STEP 6

Set & handover

Crane set, services connection, final inspection and handover.

Days on site
One group · four divisions

Named after the hardest tree in the bush

Ironbark is the eucalypt Australians reach for when something has to last — fence posts, bridges, mine timbers. It's the standard we build every module to, from a Pilbara camp to a Melbourne backyard. One steel platform, one factory partner, four Australian markets.

Division 01 · This site

Ironbark Workforce

Mining, resources and infrastructure accommodation — ensuite rooms, motel blocks and staff quarters for remote sites.

▸ Accepting EOI now
Division 02

Ironbark Homes

Turnkey modular family homes, delivered and installed — 3–4 bed designs from a factory line, not a 12-month build.

Launching — join the waitlist via EOI form
Division 03

Ironbark Stays

Glamping villas, park cabins and eco-retreat units for tourism operators, from Margaret River to the Reef.

Launching — join the waitlist via EOI form
Division 04

Ironbark Projects

Multi-storey modular for hotels, student housing and transitional housing — delivered with development partners.

By engagement
Expression of interest

Register for Production Run 01

Non-binding, no payment, no obligation. Registering places your project in the Run 01 quotation queue — EOI holders are quoted first and get first refusal on delivery slots.

What you getEOI-TERMS
PriorityFirst-quoted, first-offered slots
PricingRun 01 launch pricing held for 60 days
CommitmentNone until you accept a formal quote
ResponseScope call within 5 business days
Expression of Interest — Order FormREF: PENDING
Contact
Enter your name.
Enter your company.
Enter a valid email address.
Requirement

Non-binding · No payment taken · Reviewed by a person, not a queue

EOI Received

You're in the queue for Run 01

Thanks — your expression of interest has been logged. Our team will contact you within 5 business days to arrange a scope call.

Nothing is booked or owed at this stage.

REF: —